Being among the established construction contractors of Gujarat, we at Rajkamal Builders Infrastructure Pvt Ltd., have built a reputation as a leading constructor of water and waste water facilities for over past 20 years. We hold an expertise in the construction of new treatment plant or refurbishing an old one, and also understand the unique complexities of building within operational plants.

We have a team of skilled labor governed by engineers, who makes us able to control and schedule all important works involved in water and waste water treatment plants. These generally involve process pipe and equipment installation, yard piping, concrete placement, and structural steel fabrication and erection. Uniting our construction experience together with the ideas and perspectives of our clients and understanding their project objectives, we make it a point to deliver optimal solutions to their water and wastewater infrastructure requirements.

We start from the design phase and make it sure that the quality and safety measures are properly followed throughout in every project that we take on. We have constructed and commissioned some of the most advanced treatment projects that are available today for industrial clients and municipalities across the region. We have a tie up and collaborations with word leading technology providers for the treatments and process of waste water.

Why Choose Us?

Choosing Rajkamal Builders Infrastructure Pvt. Ltd. for your next water and waste water treatment project is recommended because of several reasons. Some of them include:

  • Our company ensures to abide by the global standards of safety, and also with the commitment to the environment and sustainability in all our construction projects.
  • We stick to our core values of honesty and integrity and ensure of delivering high quality projects within the specified time frame.
  • Our experience of over 22 years, backed by a strong cohesive team of technicians and professional engineers, along with latest machinery and construction equipment ensure of providing a superior quality work.

List of Prestigious Projects in Last 10 Years

Sr. No. NAME OF WORK LOCATION CLIENT
1 DESIGNING, CONSTRUCTING, TESTING AND COMMISSIONING OF 43 MLD UASB BASED SEWAGE TREATMENT PLANT AT KAPURAI ON TURNKEY BASIS INCLUDING PROVIDING AND LAYING RCC NP3 GRAVITY LINE AND PROVIDING PROCESS GUARANTEE FOR THE TREATMENT PLANT VADODARA, GUJARAT, INDIA EXECUTIVE ENGINEER, VADODARA MUNICIPAL CORPORATION
2 TRUNKEY JOB BASIS OF DESIGNING, PLANNING, PROCUREMENT, CONSTRUCTING, ERECTING AND COMMISSIONING OF 10 MLD CAPACITY SEWAGE TREATMENT PLANT (STP) AT SARGASAN PUMPING STATION COMPOUND, GANDHINAGAR BASED ON "CYCLIC ACTIVATED SLUDGE PROCESS/SBR TECHNOLOGY" WITH 3 YEARS 0 & M. TO TREAT THE PREDOMINANTLY DOMESTIC RAW SEWAGE TO EQUAL OR LESS THAN 5 MGL L BOD AND SUSPENDED SOLIDS SHALL BE EQUAL OR LESS THAN 10 MG/L. GANDHINAGAR, GUJARAT, INDIA EXECUTIVE ENGINEER, CAPITAL PROJECT DIVISION NO. 3, GANDHINAGAR
3 DESIGNING, CONSTRUCTION, ERECTION AND COMMISSIONING OF 25 MLD CAPACITY SEWAGE TREATMENT PLANT BASED ON CYCLIC ACTIVATED SLUDGE PROCESS/ SBR TECHNOLOGY INCLUDING 3 MONTH TRIAL RUN FOLLOWED BY 2 YEARS OF O&M WORKS FOR STP FOR PATAN UNDERGROUND DRAINAGE PROJECT PHASE II PATAN, GUJARAT, INDIA VICE PRESIDENT (CA), GUJARAT URBAN DEVELOPMENT COMPANY LTD
4 ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND 5 (FIVE) YEAR OPERATION & MAINTENANCE OF 56 MLD CAPACITY SEWAGE TREATMENT PLANT BASED ON CYCLIC ACTIVATED SLUDGE PROCESS/ SEQUENTIAL BATCH REACTOR (SBR) PROCESS AT RAIYADHAR, RAJKOT. RAJKOT, GUJARAT, INDIA CITY ENGINEER, DRAINAGE PROJECT, RAJKOT MUNICIPAL CORPORATION
5 ENGINEERING, PROCURMENT, CONSTRUCTION, COMMISSIONING (EPC) OF SEWAGE PUMPING STATION AND 60 MLD CAPACITY SEWAGE TRATMENT PLANT AT JALVIHAR, WADAJ, AHMEDABAD ALONG WITH OPERATION AND MAINTANCE OF ENTIRE PROPOSED SPS AND SEWEAGE TREATMENT FACILITY FOR TEN (10) YEARS. AHMEDABAD, GUJARAT, INDIA ADDITIONAL CITY ENGINEER, DRAINAGE PROJECT, AHMEDABAD MUNICIPAL CORPORATION
6 ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND 5 (FIVE) YEAR OPERATION & MAINTENANCE OF 70 MLD CAPACITY SEWAGE TREATMENT PLANT BASED ON CYCLIC ACTIVATED SLUDGE PROCESS/ SEQUENTIAL BATCH REACTOR (SBR) PROCESS AT GAURIDAD, RAJKOT ALONG WITH ALL RELATED MECHANICAL AND ELECTRICAL EQUIPMENTS AND ACCESSORIES, INSTRUMENTATION INCLUDING MISCELLANEOUS WORKS ETC. COMPLETE. RAJKOT, GUJARAT, INDIA CITY ENGINEER, DRAINAGE PROJECT, RAJKOT MUNICIPAL CORPORATION
7 A) SURVEY, SOIL TESTING, DESIGN, SUPPLY, CONSTRUCTION, INSTRUMENTATION AND COMMISSIONING OF 35 MLD SEWERAGE TREATMENT PLANT BASED ON OPEN TECHNOLOGY WITH ALL CONTINGENT CIVIL, ELECTRICAL, MECHANICAL, PIPING AND INSTRUMENTATION WORKS WITH SCADA AND B) REQUIRED AUGMENTATION & UP GRADATION OF EXISTING 70 MLD ASP TYPE SEWAGE TREATMENT PLANT AT VINZOL INCLUDING SUCCESSFUL TRIAL RUN OF 3 MONTHS AND COMPREHENSIVE OPERATION AND MAINTENANCE FOR 10 YEARS INCLUSIVE OF 3 YEARS DEFECT LIABILITY PERIOD. AHMEDABAD, GUJARAT, INDIA ADDITIONAL CITY ENGINEER, DRAINAGE PROJECT, AHMEDABAD MUNICIPAL CORPORATION
8 ENGINEERING, PROCURING, CONSTRUCTING, TCSTING & COMMISSIONING (EPC) OF 78MLD CAPACITY SEWAGE TREATMENT PLANT BASED ON OPEN TECHNOLOGY AT RAJIVNAGAR, OFF NEW VIP ROAD, NR. HARNI AIRPORT, VADODARA ALONG WITH OPERATION AND MAINTENANCE FOR TEN (10) YEARS VADODARA, GUJARAT, INDIA EXECUTIVE ENGINEER (DRAINAGE PROJECT), VADODARA MUNICIPAL CORPORATION
9 DESIGNING CCONSTRUCTING, TESTING AND COMMISSIONING OF 50 MLD W.T.P PLANT AT NIMETA ON TRUNKEY BASIS INCLUDING 3 YEARS OF OPERATION AND MAINTENANCE VADODARA, GUJARAT, INDIA EXECUTIVE ENGINEER, VADODARA MUNICIPAL CORPORATION
10 DESIGNING, CONSTRUCTING, TESTING AND COMMISSIONING OF 50 MLD WATER TREATMENT PLANT INCLUDING 5 YEARS OF OPERATION AND MAINTENANCE VADODARA, GUJARAT, INDIA EXECUTIVE ENGINEER, VADODARA MUNICIPAL CORPORATION